# Add or remove one value in a connection field

> Add or remove one connected record without overwriting the others, with Append Value or Remove Value in a workflow, or the Connection Field Plucker pipe.

Source: https://tadabase.com/docs/pipes/connection-field-plucker-pipe  
Status: Verified Nov 17, 2026. Checked against the current product

A connection field that holds several records, such as the Members of a project, can take one record in or out while the others stay. In a workflow, the **Update Record** action does this with **Append Value** and **Remove Value**. The Connection Field Plucker pipe does the same through the REST API.

## Add or remove a value with a workflow

1. **Add Update Record** In a workflow, add the **Update Record** action and choose the record to change.
2. **Map the connection field** Click **Add**, choose the connection field under **Target Field**, and choose where the record to add or remove comes from under **Value Source**, for example the logged-in user or a field of the workflow's record.
3. **Say how it is matched** If the value is not a record ID, use **Match by** to choose the field of the connected table that identifies the record. Choose **Record ID** when the value is already a record ID.
4. **Choose Append Value or Remove Value** **Append Value** adds the record and keeps every existing connection. **Remove Value** takes the record out and keeps the others. **Replace** overwrites the whole field.

![A connection field mapping in an Update Record step, with the Replace, Append Value and Remove Value choices under it](https://tadabase.com/docs-shots/pipes-connection-append-remove.webp)

> **Note:** **Append Value** and **Remove Value** appear only for connection fields that can hold several records. They are also offered in **Update Connected Records** and **Duplicate Record**. See [Create, update and copy records in a workflow](https://tadabase.com/docs/workflows/data-actions).

## Use the pipe instead

Apps that already use the Connection Field Plucker pipe can keep it. It has one call to remove a single value and one to add a single value. Each takes the field's current values and the value to remove or add, and returns the new list of values for you to save back to the field.

1. **Install the pipe** In the builder's left menu, click **Pipes** > **Install Pipe**, search for `Connection Field Plucker`, click it and click **Install**.
2. **Check the calls** Open the installed pipe's **API Calls** tab to see the exact name of each call and its parameters. If the pipe has a **Global Parameters** tab with an API key, enter a key from **Settings** > **API Keys** and click **Save**. See [Create and manage API keys](https://tadabase.com/docs/developers/getting-api-keys).
3. **Run a call from a workflow** Add **Trigger Pipe**, choose the add or remove call under **Pipe Method**, and set the **Parameters**: the connection field's current value from the workflow's record, and the value to add or remove.
4. **Save the result** Add **Update Record** after it and set the connection field to the new values from the pipe's response under **Step Data**, with **Replace**.
